Underground Mining of the Méquillon UG1 Deposit - Nunavik Nickel Project
ᓄᓇ ᓱᕐᕋᑕᐅᔪᖅ
ᓯᕗᒧᐊᕐᓂᖓᑕ ᐊᓪᓗᓂᖓ /
ᐅᓕᕐᓀᕈᑎᖓ
Authorization of modification of the certificate of authorization
ᐅᓕᕐᓀᕈᑎᖓ
Underground mining involves the construction of new infrastructure. An access portal to the underground ramp (5 m high by 5 m wide) will be built on the surface to the east of the pit, at the location of the existing ore impoundment area. The underground ramp will be approximately 7,143 m long, with a maximum slope of 15% and will reach a depth of 480 m. A 13,000 m2 temporary ore storage area with a capacity to hold 48,000 m3 of ore will be developed to the east of the planned building development area. Support infrastructure for underground operations will also be built, including an underground backfill plant, a mechanical workshop, five generators, diesel tanks, three ventilation raises with access roads (each approximately 25 m2), and platforms to accommodate the ventilation and emergency exit raises.
ᕋᖑᓗᕿᓴᖁᖑᑭ
2022 - 2031