Innavik Hydroelectric Project in Inukjuak - Follow-up to Condition 4 of the August 23, 2019, certificate of authorization
![Innavik Hydroelectric Project in Inukjuak - Follow-up to Condition 4 of the August 23, 2019, certificate of authorization](https://www.keqc-cqek.ca/wp-content/uploads/2018092.jpg)
![](https://www.keqc-cqek.ca/wp-content/uploads/r-picto-centrales-production-energie.png)
ᑫᓪᓗᐊᑎ /
Innavik Hydro
ᐅᓪᓗ ᐃᓱᒪᒋᔭᐅᔪᖅ ᓴᓇᓂᕐᒥᒃ ᐱᒋᐊᕐᕕᐅᓛᕐᑎᓗᒍ /
2022
ᓄᓇᓕᖓ /
Inukjuak
ᓄᓇ ᓱᕐᕋᑕᐅᔪᖅ
The Project involves the development of a run-of-river power plant about 10.3 km from the mouth of the Inukjuak River. At this point, the river is composed of four natural waterfalls, with a total height of 14.3 m spread over 2.7 km. The Project’s temporary and permanent infrastructure will be developed on Category I lands in the Northern Village of Inukjuak.
ᓯᕗᒧᐊᕐᓂᖓᑕ ᐊᓪᓗᓂᖓ /
![](/wp-content/themes/verteb/img/etapes/first-active.png)
ᐱᓇᓱᐊᑦᓴᐅᑉ ᒪᓂᔭᐅᓂᖓ
![](/wp-content/themes/verteb/img/etapes/inside-active.png)
ᐱᐅᓂᖓᑕ ᑲᒪᒍᑕᐅᓂᖓ
![](/wp-content/themes/verteb/img/etapes/inside-active.png)
ᓱᕐᕂᒍᑎᓂᒃ ᖃᐅᔨᓴᕈᑏᑦ ᐊᑐᐃᓐᓇᕈᑦᑕᐅᓂᖏᑦ
![](/wp-content/themes/verteb/img/etapes/inside-active.png)
ᕿᒥᕐᕈᓂᖅ ᐊᒻᒪᓗ ᐃᓄᐃᑦ ᐃᓚᐅᖃᑕᐅᓂᖓᑦ
![](/wp-content/themes/verteb/img/etapes/last-active.png)
ᑐᑭᑖᕐᓂᖅ ᐊᒻᒪᓗ ᐊᖏᕐᓂᖅ
ᐅᓕᕐᓀᕈᑎᖓ
compliance with condition
ᐅᓕᕐᓀᕈᑎᖓ pdf 236 KB