ᐱᓇᓱᐊᑦᓴᐅᑉ ᐊᑎᖓ /

Project to Build Four Depots for Products Covered by Extended Producer Responsibility (EPR), Scrap Tires and Hazardous Household Waste (HHW) in Akulivik, Ivujivik, Aupaluk and Tasiujaq

Project to Build Four Depots for Products Covered by Extended Producer Responsibility (EPR), Scrap Tires and Hazardous Household Waste (HHW) in Akulivik, Ivujivik, Aupaluk and Tasiujaq
ᑫᓪᓗᐊᑎ /
Kativik Regional Government
ᐅᓪᓗ ᐃᓱᒪᒋᔭᐅᔪᖅ ᓴᓇᓂᕐᒥᒃ ᐱᒋᐊᕐᕕᐅᓛᕐᑎᓗᒍ /
2024
ᓄᓇᓕᖓ /
Various communities
ᓇᔪᕐᑕᐅᔪᖅ /
The sites are located close to a northern landfill to facilitate sorting

ᓄᓇ ᓱᕐᕋᑕᐅᔪᖅ

The project will be located in four Northern Villages, with one depot per village, Akulivik, Ivujivik, Aupaluk and Tasiujaq, on Category I lands

ᓯᕗᒧᐊᕐᓂᖓᑕ ᐊᓪᓗᓂᖓ /

ᐱᓇᓱᐊᑦᓴᐅᑉ ᒪᓂᔭᐅᓂᖓ
ᐱᐅᓂᖓᑕ ᑲᒪᒍᑕᐅᓂᖓ
ᑐᑭᑖᕐᓂᖅ ᐊᒻᒪᓗ ᐊᖏᕐᓂᖅ

ᐅᓕᕐᓀᕈᑎᖓ

Questions and comments

ᐅᓕᕐᓀᕈᑎᖓ pdf 129 KB

ᐅᓕᕐᓀᕈᑎᖓ

The project involves the creation of depots for products covered by EPR, end-of-life tires and HHW. The sites are located close to a northern landfill to facilitate sorting.

Each site will consist of seven containers, adapted to the recovery of their respective residual materials, on a gravel platform measuring 21.34 x 15.24 metres and a gravel deposit area with a total surface area of 30.48 x 21.34 metres. Since the sites are far from the power grid, generators will be installed to provide site lighting and heating for the administration building. The generators will only be used during depot opening hours, i.e. about one day a week. The Aupaluk site should be close enough to the municipal garage to be hooked up to the existing power grid.

The depots will be located close to the existing road network. To reduce wear and tear on roads during material transfer, depots will be located next to existing northern landfills, except for the Aupaluk site.

ᐊᓪᓚᓯᒪᔪᐃᑦ ᕿᒥᕐᕈᔭᐅᒍᓐᓇᑐᑦ