Project of deployment of a windmill on the territory of the Northern Village of Quaqtaq

Project of deployment of a windmill on the territory of the Northern Village of Quaqtaq
ᑫᓪᓗᐊᑎ /
Les Énergies Tarquti inc.
ᐅᓪᓗ ᐃᓱᒪᒋᔭᐅᔪᖅ ᓴᓇᓂᕐᒥᒃ ᐱᒋᐊᕐᕕᐅᓛᕐᑎᓗᒍ /
2025-2026
ᓄᓇᓕᖓ /
Quaqtaq
ᓇᔪᕐᑕᐅᔪᖅ /
The site is located more than 4 km from the nearest residence south of the village, on Category I land

ᓄᓇ ᓱᕐᕋᑕᐅᔪᖅ

The project area is mainly located in the middle of tundra with prostrate shrubs where the vegetation does not exceed 20 cm high and where the mineral substrate regularly outcrops on the surface.

ᓯᕗᒧᐊᕐᓂᖓᑕ ᐊᓪᓗᓂᖓ /

ᐱᓇᓱᐊᑦᓴᐅᑉ ᒪᓂᔭᐅᓂᖓ
ᐱᐅᓂᖓᑕ ᑲᒪᒍᑕᐅᓂᖓ
ᓱᕐᕂᒍᑎᓂᒃ ᖃᐅᔨᓴᕈᑏᑦ ᐊᑐᐃᓐᓇᕈᑦᑕᐅᓂᖏᑦ
ᕿᒥᕐᕈᓂᖅ ᐊᒻᒪᓗ ᐃᓄᐃᑦ ᐃᓚᐅᖃᑕᐅᓂᖓᑦ
ᑐᑭᑖᕐᓂᖅ ᐊᒻᒪᓗ ᐊᖏᕐᓂᖅ

ᐅᓕᕐᓀᕈᑎᖓ

Guidelines for the impact study (French only)

ᐅᓕᕐᓀᕈᑎᖓ pdf 267 KB

ᐅᓕᕐᓀᕈᑎᖓ

The project consists of the installation of a 3 MW wind turbine on a site located more than 4 km from the nearest residence, on Category I land. The project includes an access road, drainage areas and a power line. The expansion of a 4.8 km seasonal access road will also be necessary. The running surface from 4 to 5 meters will have to be widened to 6 meters, in addition to the installation of culverts.