ᐱᓇᓱᐊᑦᓴᐅᑉ ᐊᑎᖓ /
Innavik Hydroelectric Project in Inukjuak - Follow-up to Condition 9 of the August 23, 2019, certificate of authorization


ᑫᓪᓗᐊᑎ /
Innavik Hydro
ᐅᓪᓗ ᐃᓱᒪᒋᔭᐅᔪᖅ ᓴᓇᓂᕐᒥᒃ ᐱᒋᐊᕐᕕᐅᓛᕐᑎᓗᒍ /
2022
ᓄᓇᓕᖓ /
Inukjuak
ᓄᓇ ᓱᕐᕋᑕᐅᔪᖅ
The Project involves the development of a run-of-river power plant about 10.3 km from the mouth of the Inukjuak River. At this point, the river is composed of four natural waterfalls, with a total height of 14.3 m spread over 2.7 km. The Project’s temporary and permanent infrastructure will be developed on Category I lands in the Northern Village of Inukjuak.
ᓯᕗᒧᐊᕐᓂᖓᑕ ᐊᓪᓗᓂᖓ /

ᐱᓇᓱᐊᑦᓴᐅᑉ ᒪᓂᔭᐅᓂᖓ

ᐱᐅᓂᖓᑕ ᑲᒪᒍᑕᐅᓂᖓ

ᑐᑭᑖᕐᓂᖅ ᐊᒻᒪᓗ ᐊᖏᕐᓂᖅ
ᐅᓕᕐᓀᕈᑎᖓ
Compliance with condition
ᐅᓕᕐᓀᕈᑎᖓ pdf 254 KBᐅᓕᕐᓀᕈᑎᖓ
Condition 9:
The proponent must submit, for information purposes, an annual report presenting its monitoring of drinking-water quality during the construction period. Incidents, mitigation measures taken and observations made during discussions with the monitoring and consultation committee must be included in this report.