The Project involves the development of a run-of-river power plant about 10.3 km from the mouth of the Inukjuak River. At this point, the river is composed of four natural waterfalls, with a total height of 14.3 m spread over 2.7 km. The Project’s temporary and permanent infrastructure will be developed on Category I lands in the Northern Village of Inukjuak.

ᓯᕗᒧᐊᕐᓂᖓᑕ ᐊᓪᓗᓂᖓ /

ᐱᓇᓱᐊᑦᓴᐅᑉ ᒪᓂᔭᐅᓂᖓ
ᐱᐅᓂᖓᑕ ᑲᒪᒍᑕᐅᓂᖓ
ᑐᑭᑖᕐᓂᖅ ᐊᒻᒪᓗ ᐊᖏᕐᓂᖅ

ᐅᓕᕐᓀᕈᑎᖓ

Compliance with condition

ᐅᓕᕐᓀᕈᑎᖓ pdf 254 KB

ᐅᓕᕐᓀᕈᑎᖓ

Condition 9:
The proponent must submit, for information purposes, an annual report presenting its monitoring of drinking-water quality during the construction period. Incidents, mitigation measures taken and observations made during discussions with the monitoring and consultation committee must be included in this report.