The Project involves the development of a run-of-river power plant about 10.3 km from the mouth of the Inukjuak River. At this point, the river is composed of four natural waterfalls, with a total height of 14.3 m spread over 2.7 km. The Project’s temporary and permanent infrastructure will be developed on Category I lands in the Northern Village of Inukjuak.