ᐱᓇᓱᐊᑦᓴᐅᑉ ᐊᑎᖓ /

Construction of a new access road on the territory of the Northern Village of Inukjuak

Construction of a new access road on the territory of the Northern Village of Inukjuak
ᑫᓪᓗᐊᑎ /
Hydro-Québec, TransÉnergie et Équipement
ᐅᓪᓗ ᐃᓱᒪᒋᔭᐅᔪᖅ ᓴᓇᓂᕐᒥᒃ ᐱᒋᐊᕐᕕᐅᓛᕐᑎᓗᒍ /
July 2021 to December 2022
ᓄᓇᓕᖓ /
Inukjuak

ᓄᓇ ᓱᕐᕋᑕᐅᔪᖅ

The new access road will be located about 1.5 km from the north end of the village of Inukjuak between the landing and the road leading to the future Innavik generating station. The access road is located on Category I lands

ᓯᕗᒧᐊᕐᓂᖓᑕ ᐊᓪᓗᓂᖓ /

ᐱᓇᓱᐊᑦᓴᐅᑉ ᒪᓂᔭᐅᓂᖓ
ᐱᐅᓂᖓᑕ ᑲᒪᒍᑕᐅᓂᖓ
ᑐᑭᑖᕐᓂᖅ ᐊᒻᒪᓗ ᐊᖏᕐᓂᖅ

ᐅᓕᕐᓀᕈᑎᖓ

ᐅᓕᕐᓀᕈᑎᖓ

The project involves building an access road between the site of the new 25-kV substation that will be commissioned in 2022 to serve the new Innavik generating station and the road leading to the future generating station, which passes nearby. The access road will be about 143 m long, with a road surface 7.0 m wide. The right-of-way will be 8.8 m wide, including the shoulders.

ᕋᖑᓗᕿᓴᖁᖑᑭ

- Detailed engineering: July 2020 to December 2020 - Call for tenders and contract award: March to May 2021 - Construction: July 2021 to December 2022

ᐊᓪᓚᓯᒪᔪᐃᑦ ᕿᒥᕐᕈᔭᐅᒍᓐᓇᑐᑦ