Name of the project /

Innavik Hydroelectric Project in Inukjuak - Follow-up to Condition 4 of the August 23, 2019, certificate of authorization

Innavik Hydroelectric Project in Inukjuak - Follow-up to Condition 4 of the August 23, 2019, certificate of authorization
Proponent /
Innavik Hydro
Expected date of construction /
2022
Community /
Inukjuak

Affected area

The Project involves the development of a run-of-river power plant about 10.3 km from the mouth of the Inukjuak River. At this point, the river is composed of four natural waterfalls, with a total height of 14.3 m spread over 2.7 km. The Project’s temporary and permanent infrastructure will be developed on Category I lands in the Northern Village of Inukjuak.

Step of the procedure /

Project submission
Evaluation
Decision and authorization

Decision

Compliance with the condition

Decision pdf 254 KB

Description

Condition 9:
The proponent must submit, for information purposes, an annual report presenting its monitoring of drinking-water quality during the construction period. Incidents, mitigation measures taken and observations made during discussions with the monitoring and consultation committee must be included in this report.

Documents available for consultation