Name of the project /
Innavik Hydroelectric Project in Inukjuak - Follow-up to Condition 4 of the August 23, 2019, certificate of authorization
Proponent /
Innavik Hydro
Expected date of construction /
2022
Community /
Inukjuak
Affected area
The Project involves the development of a run-of-river power plant about 10.3 km from the mouth of the Inukjuak River. At this point, the river is composed of four natural waterfalls, with a total height of 14.3 m spread over 2.7 km. The Project’s temporary and permanent infrastructure will be developed on Category I lands in the Northern Village of Inukjuak.
Step of the procedure /
Project submission
Evaluation
Decision and authorization
Decision
Compliance with the condition
Decision pdf 254 KBDescription
Condition 9:
The proponent must submit, for information purposes, an annual report presenting its monitoring of drinking-water quality during the construction period. Incidents, mitigation measures taken and observations made during discussions with the monitoring and consultation committee must be included in this report.