Innavik Hydroelectric Project - Addition of areas on the left bank of Inukjuak River
Affected area
Step of the procedure /
Decision
Authorization of the amendment of the certificate of authorization (French only)
Decision pdf 224 KBDescription
For the excavation of the spillway and the diversion canal to go forward, temporary and permanent storage areas will be necessary on the left bank of Inukjuak River.
The temporary storage area will be used to store construction materials and machinery and will have an area of 25,755 m2.
The permanent storage area will be used to store materials that will be excavated during the construction of the diversion canal and spillway, will have an area of 26,146 m2 and will store approximately 200,000 tonnes of aggregate.
Calendar
The proponent wishes to initiate site preparation work in may 2021